NCT00335140 · FLOW
Participant flow
Results reported by the registry submitting party. Population, time horizon, units and missing values must be read together.
- groups
- description
- rituximab cytarabine dexamethasone leucovorin calcium methotrexate procarbazine hydrochloride vincristine sulfate
- id
- FG000
- title
- Rituximab + Standard Chemotherapy
- periods
- drop Withdraws
- reasons
- group Id
- FG000
- num Subjects
- 1
- type
- Ineligible
- milestones
- achievements
- group Id
- FG000
- num Subjects
- 26
- type
- STARTED
- achievements
- group Id
- FG000
- num Subjects
- 25
- type
- Eligible
- achievements
- group Id
- FG000
- num Subjects
- 25
- type
- Treated
- achievements
- group Id
- FG000
- num Subjects
- 25
- type
- COMPLETED
- achievements
- group Id
- FG000
- num Subjects
- 1
- type
- NOT COMPLETED
- title
- Overall Study
- recruitment Details
- Participants were recruited from ECOG-ACRIN member institutions starting 12/21/2006 and accrued its first patient on 08/23/2007. The study was suspended 2/24/2010 for interim analysis. After the interim analysis, it was determined that the goals of the study had been met and the study was closed on 4/12/2013.
Complete source fields
- groups
- description
- rituximab cytarabine dexamethasone leucovorin calcium methotrexate procarbazine hydrochloride vincristine sulfate
- id
- FG000
- title
- Rituximab + Standard Chemotherapy
- periods
- drop Withdraws
- reasons
- group Id
- FG000
- num Subjects
- 1
- type
- Ineligible
- milestones
- achievements
- group Id
- FG000
- num Subjects
- 26
- type
- STARTED
- achievements
- group Id
- FG000
- num Subjects
- 25
- type
- Eligible
- achievements
- group Id
- FG000
- num Subjects
- 25
- type
- Treated
- achievements
- group Id
- FG000
- num Subjects
- 25
- type
- COMPLETED
- achievements
- group Id
- FG000
- num Subjects
- 1
- type
- NOT COMPLETED
- title
- Overall Study
- recruitment Details
- Participants were recruited from ECOG-ACRIN member institutions starting 12/21/2006 and accrued its first patient on 08/23/2007. The study was suspended 2/24/2010 for interim analysis. After the interim analysis, it was determined that the goals of the study had been met and the study was closed on 4/12/2013.
Download exact source JSON → · Snapshot ctgov-results-25a395029948b04d52b1253f
Preserved source evidence · Not medical advice
Triangle