{"classes":[{"categories":[{"measurements":[{"groupId":"OG000","value":"2.7"},{"groupId":"OG001","value":"1.0"},{"groupId":"OG002","value":"0.8"}]}],"title":"1 Cycle Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"1.3"},{"groupId":"OG001","value":"0.5"},{"groupId":"OG002","value":"0.4"}]}],"title":"2 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"1.1"},{"groupId":"OG001","value":"0.5"},{"groupId":"OG002","value":"0.1"}]}],"title":"3 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"1.6"},{"groupId":"OG001","value":"1.2"},{"groupId":"OG002","value":"0.7"}]}],"title":"4 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"1.3"},{"groupId":"OG001","value":"0.8"},{"groupId":"OG002","value":"0.6"}]}],"title":"5 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"1.6"},{"groupId":"OG001","value":"0.5"},{"groupId":"OG002","value":"0.1"}]}],"title":"6 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"2.2"},{"groupId":"OG001","value":"0.7"},{"groupId":"OG002","value":"0.8"}]}],"title":"7 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"2.2"},{"groupId":"OG001","value":"0.9"},{"groupId":"OG002","value":"0.3"}]}],"title":"8 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"1.8"},{"groupId":"OG001","value":"0.2"},{"groupId":"OG002","value":"0.6"}]}],"title":"9 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"1.5"},{"groupId":"OG001","value":"0.3"},{"groupId":"OG002","value":"0.1"}]}],"title":"10 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"3.5"},{"groupId":"OG001","value":"0.4"},{"groupId":"OG002","value":"0.3"}]}],"title":"11 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"2.5"},{"groupId":"OG001","value":"0.9"},{"groupId":"OG002","value":"0.8"}]}],"title":"12 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"4.9"},{"groupId":"OG001","value":"0.2"},{"groupId":"OG002","value":"0"}]}],"title":"13 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"6.9"},{"groupId":"OG001","value":"0.5"},{"groupId":"OG002","value":"0.6"}]}],"title":"14 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"10.7"},{"groupId":"OG001","value":"0.5"},{"groupId":"OG002","value":"0.4"}]}],"title":"15 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"21.6"},{"groupId":"OG001","value":"0.6"},{"groupId":"OG002","value":"0.3"}]}],"title":"16 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"32.5"},{"groupId":"OG001","value":"1.0"},{"groupId":"OG002","value":"1.1"}]}],"title":"17 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"0"},{"groupId":"OG001","value":"89.2"},{"groupId":"OG002","value":"91.8"}]}],"title":"18 Cycles Received"},{"categories":[{"measurements":[{"groupId":"OG000","value":"0"},{"groupId":"OG001","value":"0.2"},{"groupId":"OG002","value":"0"}]}],"title":"19 Cycles Received"}],"denoms":[{"counts":[{"groupId":"OG000","value":"550"},{"groupId":"OG001","value":"1864"},{"groupId":"OG002","value":"709"}],"units":"Participants"}],"description":"Participants were planned to receive a total of 18 cycles of SC Herceptin. The percentage of participants was reported by the total number of cycles actually received. Because the data are presented non-cumulatively, this table reflects participant distribution by the highest number of cycles received.","groups":[{"description":"Participants received SC Herceptin as 600 mg every 3 weeks for a total of 18 doses/cycles. Each dose of SC Herceptin was administered from a pre-filled SID. Dosing was either performed by self-administration or a qualified HCP. The present subgroup included only participants for whom SC Herceptin was given by self- administration.","id":"OG000","title":"Cohort B: SC Herceptin by SID (Self- Administered)"},{"description":"Participants received SC Herceptin by an assisted administration as 600 mg every 3 weeks for a total of 18 doses/cycles. Each dose of SC Herceptin was taken from a single-use vial and injected by needle/syringe.","id":"OG001","title":"Cohort A: SC Herceptin by Needle/Syringe"},{"description":"Participants received SC Herceptin as 600 mg every 3 weeks for a total of 18 doses/cycles. Each dose of SC Herceptin was administered from a pre-filled SID. The first administration was performed by an HCP. Subsequent doses were self-administered by participants who were willing and judged competent by the HCP.","id":"OG002","title":"Cohort B: SC Herceptin by SID"}],"paramType":"NUMBER","populationDescription":"Safety Population. The endpoint also included an analysis of a subgroup of participants from Cohort B who received doses of self-administered SC Herceptin via SID.","reportingStatus":"POSTED","timeFrame":"From Day 1 up to 19 cycles (cycle length 3 weeks) (approximately 1 year)","title":"Percentage of Participants by Total Number of Herceptin Cycles Received","type":"PRIMARY","unitOfMeasure":"percentage of participants"}